August 10 2009 update

CIRCA 2 is now on the 15th floor ... 1 more to go !! :)

South Side
IMG_1469.jpg


North Side
IMG_1470.jpg


CIRCA 1+2 together is sure forming quite a wall ~
IMG_1471.jpg

IMG_1472.jpg

IMG_1473.jpg

IMG_1474.jpg

IMG_1475.jpg
 
Yeah, thanks for taking all the pictures.

16th floor should be done next week and then just the roof week of the 24th if all goes well.
 
August 25 2009 update

CIRCA 2 is now topped off ~ :)

South Side
IMG_1532.jpg

Click to Enlarge Thumbnails


North Side
IMG_1537.jpg

Click to Enlarge Thumbnails


Precast being lifted into place 6th floor + above ~
IMG_1542.jpg
 
September 3 2009 update

South Side - last floor topped off ~ :)
IMG_1570.jpg


This angle matches with the original rendering
IMG_1568.jpg


Click to Enlarge Thumbnails


North Side
IMG_1572.jpg


Click to Enlarge Thumbnails
 
September 13 2009 update

CIRCA 2 at sunset ~ :)

IMG_1575.jpg
 
September 16 2009 update

CIRCA 1+2 as seen in the morning sun
IMG_1592.jpg


Parts of the building (the cylinders on the left) tapers outwards like a cone ~
IMG_1593.jpg
 
September 29 2009 update

South Side
IMG_1611.jpg


North Side
IMG_1612.jpg


Transformation (Colouring) of the Precast Brick Panels Begin ! :)
Click to Enlarge Thumbnails
 
yeah the precast brick on CIRCA 1+2 are definitely very convincing ... I was very suprised when I first found out it wasn't "real" brick ....

but I'm pretty sure the brick on Majestic Court are real ... I saw them during the installation process ~
 
yeah the precast brick on CIRCA 1+2 are definitely very convincing ... I was very suprised when I first found out it wasn't "real" brick ....

but I'm pretty sure the brick on Majestic Court are real ... I saw them during the installation process ~

I think the fake ones on Circa looks way better than the real ones they have over at Majestic lol.
 
Circa now is offering the "diamond" collection, does anyone know what was included in the units before the diamond collection came out? I talked to the sales and she basically said something that is of lower class and did not specify further.
 
October 16 2009 update

note: sorry these pictures in full size won't work until October 21st ... it appears that my Photobucket 10 GB monthly bandwidth limit has been exceeded ~ :eek:

Precast Brick Painting continues at CIRCA 2 - cladding up to the 11th floor, windows up to the 9th floor
Click to Enlarge
 
October 17 2009 update

note: sorry these pictures in full size won't work until October 21st ... it appears that my Photobucket 10 GB monthly bandwidth limit has been exceeded ~ :eek:

Highway 7 was partially blocked off on Saturday - for a ground hydraullic crane to hoist rooftop mechanicals units into place
Click to Enlarge
 
November 17 2009 update

Windows installation begins on the 7th floor ~
IMG_1833.jpg


Click to Enlarge
 