mdrejhon
Senior Member
Plus how much for (HSR/HFR/RER/express/dedicated) freight-separated corridor through Brampton while keeping freight -- the cost of associated grade separations?Its over a Billion dollars to 4 track the Milton line and far far cheaper than trying to do this bypass.
One more billion dollars or so?
Probably still cheaper, I am curious.
From the Metrolinx RER business case, some wild guessing can be had from the Metrolinx "full" RER $19bn versus $13.5bn optimized scenario, a cost difference of 5.5 billion. Subtract the Richmond Hill cost, and the EMU fleet scaleback, a wild guess is roughly about 3 billion total for dedicated all-day Kitchener and Milton solutions, totalled?
Last edited: