innsertnamehere
Superstar
Hopefully, he realizes, or someone points out, how much less expensive an elevated line would be when compared to a fully tunnelled line along Eglinton.
Then when the budget is balanced in 2017, prior to the next election, he could extend the Sheppard subway east and west instead of resurrecting the SELRT and FWLRT.
It is true that this would represent a 4 year delay until farther transit construction – which is basically the same delay the current Liberals are proposing.
how so? transit funding will be secured by the end of the year under the liberals, while you will be looking at 2017 to even start looking at funding under Hudak. And if you are claiming that the Sheppard subway is needed more than the DRL I might as well not be arguing with you.
and you are talking about Hudak here, who somehow thought it would be a good idea to propose chain gangs. He is not going to get the idea to elevate the line.