News   May 10, 2024
 719     0 
News   May 10, 2024
 849     0 
News   May 10, 2024
 930     0 

Search results

  1. reinventingthewheel

    Toronto King-Liberty GO Station | 21.39m | 3s | Metrolinx | WSP

    I know this is an old resurfaced comment but I want to highlight the site context for others. The bridge could not easily be relocated further east as the ROW is squeezed thin. Yes the entrances are offset from vehicle paths, but there are many direct walkable paths from Queen using this...
  2. reinventingthewheel

    Finch West Line 6 LRT

    Link to youtube
  3. reinventingthewheel

    Toronto Crosstown LRT | ?m | ?s | Metrolinx | Arcadis

    This video looks exciting and promising when watched at 2x speed. I really liked the part where the single rich person in a Lamborghini had turning priority over the LRV.
  4. reinventingthewheel

    Toronto CIBC SQUARE | 241.39m | 50s | Hines | WilkinsonEyre

    Core just about topped out and the rest is filling in the skyline from north east.
  5. reinventingthewheel

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    I think I put this one near the bottom of my ballot. The shape, colour, and cables all create a shared theme of bridges in the channel (future OL Lower Don Bridge and other Villiers Island bridges). Some will favour the consistency, personally I would prefer a variety.
  6. reinventingthewheel

    Toronto Forma | 308m | 84s | Great Gulf | Gehry Partners

    The addresses for this are a bit messy; lot control splitting, rezoning, assembly. The second phase (west tower) will stretch from King St to Pearl St and from Ed Mirvish Way to Princess of Whales Theatre. Next to the theatre the Anderson Building facade will be retained.
  7. reinventingthewheel

    King Street (Streetcar Transit Priority)

    There can be important context to every infraction detected so it will be a full time gig for whoever gets to review all the footage before ticketing – what a dull job that’ll be! For instance, one time my car was blocked from clearing Queen and Spadina by some contravening vagrants. When my...
  8. reinventingthewheel

    Sheppard Line 4 Subway Extension (Proposed)

    One car is what- 20m long? I think the typical proposed stations for Eglinton were designed to provide a 60m platform and 30m reserved before service areas. I can’t confirm they actually followed through with that since this is one of the least transparent public project developments in the...
  9. reinventingthewheel

    Mississauga Mississauga Transitway | ?m | ?s | Metrolinx | IBI Group

    Once line 5 opens I imagine many transitway travellers will benefit from Eglinton as an alternate route into Toronto. Take for example approximate travel time Renforth to St. George: Bloor Route: 36+ mins to St George MiWay / GO: 13+ minute bus ride Renforth to Kipling Line 2: 23 minute train...
  10. reinventingthewheel

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    I think the choice to launch the TBM at Corktown rather than anywhere closer to the portal tells us all we need to know about station feasibility around here. The grade change isn’t the steepest on the line, ascending much closer to the Don river and at a lower height than the existing rail...
  11. reinventingthewheel

    GO Transit: Construction Projects (Metrolinx, various)

    I thought maybe the same reason they lock up the enclosed shelters. Metrolinx has stated there are safety concerns at the station including vandalism, drug use, trespassing and assault. Rubbish solutions though, it’s unclear what makes this any different from other stations in city centres like...
  12. reinventingthewheel

    King Street (Streetcar Transit Priority)

    They are a small barrier, but what’s above is mostly visible. Consider the streetcar necessary action signs hung above the catenary. I don’t think aligning the signage in places like this should be ruled out as an option.
  13. reinventingthewheel

    Toronto Ontario Line 3 | ?m | ?s

    Initial conditions for this project are a mostly 3 track corridor, with bridges built for up to 4 tracks. The easternmost track has been removed since. At the bottom of your latest photo you can see the extra room under the train signal where a third track ran.
  14. reinventingthewheel

    Toronto Ontario Line 3 | ?m | ?s

    Yes. Currently they are clearing on the east side of the corridor. They will rebuild eastern portions of each bridge and regrade for 3 new GO tracks on the east side of active tracks. Service will move onto the new tracks and the west side of the corridor will be rebuilt with 1 new GO track...
  15. reinventingthewheel

    Mississauga Hurontario-Main Line 10 LRT | ?m | ?s | Metrolinx

    If concerns like these were ever truly considered we wouldn’t have Flemingdon Park and Flemington Park in Toronto.
  16. reinventingthewheel

    St Lawrence Market

    New condo sales centre (I suspect) at 141 King E, next to market lane, facing St James Park. Doesn’t look open yet. No hits on google for Missoni Sky so I have no clue where this tower is proposed. As far as I can tell online Missoni is the name of a textile brand.
  17. reinventingthewheel

    Toronto Lower Don Lands Redevelopment | ?m | ?s | Waterfront Toronto

    As has been demonstrated, introducing all these extra elevators, schools, and any non-dwelling space stretches your floor space thin. It results in taller and wider towers with fewer setbacks. If you look through the traffic projections from most recent slides (I believe NL posted screens here...
  18. reinventingthewheel

    TTC: Other Items (catch all)

    I would hope there was an expedited review of film and witness statements. Perhaps this was actually done and they have reason to conduct further investigation on track level now. The main thing to emphasize here:
  19. reinventingthewheel

    New Tecumseth Honda Electric Vehicle Battery Plant | ?m | ?s | Honda

    Here are a couple satellite shots of Honda's existing Alliston plant. The site lies on Industrial Pkwy connecting it to Hwy 89 and has a spur in the CP MacTier sub. I imagine the new facilities will be in proximity, which means expanding south (the built up site on the south side of...
  20. reinventingthewheel

    Mississauga Square One District Phase One | ?m | 52s | Oxford Properties | Arcadis

    Great shot of the new LRT bridge pier and abutment!

Back
Top