News   Dec 20, 2024
 1.2K     6 
News   Dec 20, 2024
 893     2 
News   Dec 20, 2024
 1.8K     0 

Search results

  1. R

    Toronto One Bloor East | 257.24m | 76s | Great Gulf | Hariri Pontarini

    There is a completed balcony on the east side including ALL curves (convex and concave) Looks pretty good!
  2. R

    Toronto U Condominiums | 183.79m | 56s | Pemberton | a—A

    Staff Report January 25, 2008 shows: West Tower - 145m to roof and 154m to mechanical East Tower - 175m to roof and 184m to mechanical
  3. R

    Toronto Massey Tower Condos | 206.95m | 60s | MOD Developments | Hariri Pontarini

    Worker dude on site confirmed this is crane weekend!
  4. R

    Toronto Massey Tower Condos | 206.95m | 60s | MOD Developments | Hariri Pontarini

    Signs are up for Victoria St road closure this weekend. Might we see some crane action!?!
  5. R

    Toronto One Bloor East | 257.24m | 76s | Great Gulf | Hariri Pontarini

    It looks like they are currently framing the first of the two extra height floors. Then the mechanical which looks to be the equivalent of 5 regular height floors. (this is based on the wind study model - link posted previously)
  6. R

    Toronto The Residences of 488 University Avenue | 206.95m | 55s | Amexon | Core Architects

    The installed base of a tower crane on the roof was visible this afternoon.
  7. R

    Toronto Massey Tower Condos | 206.95m | 60s | MOD Developments | Hariri Pontarini

    They have poured concrete slab on the entire west portion of the site.
  8. R

    Toronto Theatre District Residence & Riu Plaza Hotel | 156.05m | 49s | Plaza | BDP Quadrangle

    There is some light demolition currently happening on site.
  9. R

    Toronto Picasso Condos | 128.62m | 39s | Mattamy Homes | Teeple Architects

    Crane dismantling is happening right now.
  10. R

    Toronto Smart House | 82.6m | 25s | Urban Capital | a—A

    There was caisson machinery active on site this morning.
  11. R

    Toronto 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

    The planning report from July 18, 2014 lists this one as 156-174 Front St W and 43-51 Simcoe St, so unfortunately it looks like a reduction. Or hopefully a typo in the site plan approval document...
  12. R

    Toronto Aura at College Park | 271.87m | 78s | Canderel | Graziani + Corazza

    In the picture from Humber Bay shores, does it look like they are fixing the part where the slope stops and goes vertical? (he says hopefully...)
  13. R

    Toronto Ten York Street Condos | 224.02m | 65s | Tridel | Wallman Architects

    First piece of tower crane is up!
  14. R

    Toronto Ten York Street Condos | 224.02m | 65s | Tridel | Wallman Architects

    Webcam is showing a big mobile crane in the pit. For tower crane installation?
  15. R

    Toronto Aura at College Park | 271.87m | 78s | Canderel | Graziani + Corazza

    The second rooftop crane seems to be busy.
  16. R

    Toronto Theatre Park | 156.96m | 47s | Lamb Dev Corp | a—A

    Looks like the crane dismantling is underway.
  17. R

    Toronto Aura at College Park | 271.87m | 78s | Canderel | Graziani + Corazza

    They've started cladding right up to the roof slope on the north-east corner.
  18. R

    Toronto RBC WaterPark Place III | 140.2m | 30s | Oxford Properties | WZMH

    The bridge actually pre-dates the Menkes project and would have been built without it. The bridge is initially designed and created for RBC Waterpark Place, the Menkes project just got in the way.

Back
Top