News   Nov 28, 2024
 60     0 
News   Nov 27, 2024
 829     4 
News   Nov 27, 2024
 701     1 

Search results

  1. S

    Toronto Atrium on Bay Expansion | 114m | 34s | KingSett Capital | Hariri Pontarini

    I had a quick peek into the MUJI space under construction - there is a large rectangular cutout in the flooring for what would most likely be the base for an escalator. There also appears to be a 2nd floor being constructed above. I'm fairly sure that the new MUJI store will be at least 2 storeys.
  2. S

    Toronto Eaton Centre

    It's under renovation, re-opening sometime in June I believe.
  3. S

    Toronto Eaton Centre

    Rinascimento will be opening in the former Bench location on Level 2. Haight & Ashbury will be returning again to the mall on May 15th - perhaps in their old location? HiO is now closed.
  4. S

    Toronto Atrium on Bay Expansion | 114m | 34s | KingSett Capital | Hariri Pontarini

    New 2nd floor extension over the 20 Dundas West lobby:
  5. S

    Toronto Atrium on Bay Expansion | 114m | 34s | KingSett Capital | Hariri Pontarini

    Renovations at the Tim Hortons on the concourse have been completed...and it looks exactly the same as it was before, minus the seating. There is no new escalator from the concourse to the first floor beside the store, but the ceiling has been repaired. I heard from multiple sources that it was...
  6. S

    Toronto Eaton Centre

    Capezio is gone. Dynamite has re-opened after their renovation. Their temporary store beside Victoria's Secret has been replaced by a temp store for Garage, which is also undergoing renovations. Trade Secrets and EB Games appear to be swapping spaces - EB will be using their "EBX" concept when...
  7. S

    Holt Renfrew (includes hr2)

    I think there's supposed to be a renovation in collaboration with Colette Grand Cafe.
  8. S

    Toronto Eaton Centre

    EB Games on Level 1 has suddenly closed. The hoarding says that Trade Secrets (currently next door) will be moving in after it renovates. Freshii has re-opened after their renovation. Upstairs on Level 2, the HiO pop-up shop is closing.
  9. S

    2018 Ontario Provincial Election Discussion

    Vote buying 101, you say? Where have we seen this before? Hmmm....
  10. S

    Toronto Eaton Centre

    I think Capezio Shoes on Level 2 might be closing. They've been having a sale on everything in store for a while now and stock looks like it's dwindling.
  11. S

    Toronto Eaton Centre

    Purdy's Chocolate will be replacing the Freshly Squeezed and Yogen Fruz shops that recently closed on Level 1, beside Mrs. Field's.
  12. S

    Toronto Atrium on Bay Expansion | 114m | 34s | KingSett Capital | Hariri Pontarini

    We'll see what ends up being built - it will probably be like the stairs to Queen Station on the northwest corner of Yonge and Queen. I think things might have been different had they been able to build a new entrance into the subway by using the building that currently houses Forever 21 at 302...
  13. S

    Toronto Atrium on Bay Expansion | 114m | 34s | KingSett Capital | Hariri Pontarini

    The wooden hoarding in my picture above has been removed, and the glass window panel behind has been replaced by drywall, along with what seems to be a temporary wooden door.
  14. S

    Restaurant Comings & Goings

    That's the same location where Tokyo Kitchen used to be. If they are re-opening, I hope that washrooms have been built inside the restaurant. They used to give you a key, and you had to go outside and venture up into the parking lot to use the facilities.
  15. S

    Restaurant Comings & Goings

    Caribbean Taste at 222 The Esplanade and Princess (the former Coffee Time) is closed. They suddenly shut down during the holidays with a sign saying they were under renovation until further notice. Their Yelp page says the restaurant will re-open on March 30th. I think the new FOR LEASE sign in...
  16. S

    Toronto Atrium on Bay Expansion | 114m | 34s | KingSett Capital | Hariri Pontarini

    Could this possibly the new TTC entrance/exit for Dundas station from the Atrium, or is it just a new entrance for MUJI?
  17. S

    Toronto Atrium on Bay Expansion | 114m | 34s | KingSett Capital | Hariri Pontarini

    A new escalator is being built adjacent to the Tim Hortons, connecting the concourse with the ground floor upstairs. That explains the hoarding around the store. Could this be a different exit to the street (instead of or complementing the planned stairs), or part of the MUJI renovation...
  18. S

    Toronto Atrium on Bay Expansion | 114m | 34s | KingSett Capital | Hariri Pontarini

    Renovation and expansion of MUJI is under way into the old Long Tall Sally space at 306 Yonge. Below on the concourse level, drywall hoarding has been built up around the Tim Hortons, removing the customer seating. This appears to be underneath the construction for MUJI, but I'm unsure if this...
  19. S

    Toronto Eaton Centre

    Miniso will be opening on Level 1, in between Fido and The Canadian Naturalist.
  20. S

    Toronto Eaton Centre

    A Real Fruit Bubble Tea shop is opening in its place.

Back
Top