News   Jul 15, 2024
 435     0 
News   Jul 15, 2024
 546     1 
News   Jul 12, 2024
 2K     1 

Search results

  1. interchange42

    250 Lawrence West (Graywood) - Real Estate -

    Sorry, typo. I meant to type Concert, who are headquartered in BC, and where they are required to have everything completed prior to occupancy, which was the point of the comment (nothing to do with Toronto-based Context, my bad). 42
  2. interchange42

    Whitby The Charlotte Whitby | ?m | 6s | Castleview | V+A Architects

    Official website not responding as of August, 2023. Anyone know what the status is here? 42
  3. interchange42

    Brampton UPtowns at Heart Lake | ?m | 4s | VANDYK

    As mentioned recently in this thread, we don't create separate Real Estate threads for smaller projects. 42
  4. interchange42

    Toronto Central Condos | 138.98m | 46s | Concord Adex | DIALOG

    We could. The street level on this is dreadful. Cheap materials, and looks like the interactivity with the street will be next to non-existent other than at the front doors themselves. 42
  5. interchange42

    Toronto Sugar Wharf Condominiums (Phase 2) | 299m | 90s | Menkes | a—A

    I assume that is what is going on, because no, they have not sold Phase Two yet. 42
  6. interchange42

    Toronto St Michael's Hospital Patient Care Tower & Emergency Department | ?m | 17s | St. Michael's | NORR

    For work on the northeast corner of this site where the new emergency department will go, please go to this dedicated thread. In the meantime, this thread on the completed Patient Care Tower is now locked. 42
  7. interchange42

    Pickering FGF Manufacturing Campus | ?m | 1s | Caplink | Baldassarra Architects Inc

    Dempsters, Stonemill, Dimpflmeier, Rudolph's are among those that escape the roundup. Meanwhile, nice of them to invite Grimace to the sod turning, but with an orange instead of purple face. 42
  8. interchange42

    Toronto 15-17 Elm | 99m | 30s | Fora | PARTISANS

    So, curiously, in May 2023, Council stated its intention to designate, and then in July, affirmed that intention. Maybe in September they'll confirm that they affirmed their intention, in November reiterate it, in January revoke it, in March reinstate it, and finally in May 2024 redact...
  9. interchange42

    Toronto 15-17 Elm | 99m | 30s | Fora | PARTISANS

    All I see in the City Council record is that this motion was passed with amendments at their May 10, 2023 meeting. 42
  10. interchange42

    Toronto Westbend Residences | 44.08m | 13s | Mattamy Homes | BDP Quadrangle

    From the subway on the 24th: I don't see any work on the geothermal, and with three more levels to excavate first, I have to think that what's happening now is just more shoring, this time along the north edge of the site, 42
  11. interchange42

    Toronto 1109 Bathurst Street | 31.9m | 8s | Talus Capital | Paul Hastings Architect

    Approved. by the OLT in April, 2022, the developer here has submitted just updated plans looking to get NOAC from the City on various tweaks since... it'll still be an 8-storey storage unit building, no groundbreaking changes...
  12. interchange42

    Vaughan 7800 Jane | 192.93m | 60s | Aspen Ridge | BDP Quadrangle

    The variation of the scallops at the entrances, however, is actually related to the design of the rest of the podium, so that's one big step ahead of the pretenders… but the two towers should be better tied in with that scallop motif, and they should relate better to each other too. 42
  13. interchange42

    Hamilton 1223 Main Street West | ?m | 8s | Scholar Properties | CGS Architects

    Any chance this was submitted to the City of Hamilton on April 1, and submission fee paid for with Monopoly money? 42
  14. interchange42

    East Gwillimbury Holland Green Village | 31.2m | 9s | OLV | Makow

    So the curviness comes from Bath, the designs are Place des Vosges Parisian wannabes, and the complex is Holland Green Village? Pick one! 42
  15. interchange42

    Toronto Serra House Expansion | ?m | 4s | BNKC

    Yup. Smaller jobs, especially those with a number of custom pieces, end up taking longer to complete than the bigger jobs as everyone from the manufacturers of the custom pieces to the installation trades people concentrate on the bigger jobs that will make them more money. The smaller jobs...
  16. interchange42

    Pickering 720 Granite Court | 42.65m | 12s | Metrics | Onespace

    This site could easily handle this building, even if it's not currently zoned for it. Brenner's (feigned?) ALL CAPS outrage is an eyeball-rolling cringefest of unearned hyperbole. Yawn. 42
  17. interchange42

    Toronto The 9Hundred | 71.6m | 21s | Harhay | Core Architects

    Highway 427 and Eglinton Avenue is a neighbourhood? Yeah, and I'm a traffic sewer. (The neighbourhood, just across the fenced-in back yards on the other side of The East Mall is West Deane.) 42
  18. interchange42

    Clarington Modo 55 | ?m | 12s | Kaitlin | Chamberlain

    Thanks, but we're not tracking cranes in Clarington, as we don't have a full enough or a reliably updated picture of construction activity in that town yet. 42
  19. interchange42

    Toronto 475 Yonge Street | 255.76m | 78s | KingSett Capital | BDP Quadrangle

    Exactly, that's a regulation that just needs to exist (whether that ratio of 1/100 is eventually established, or there's some other formula created, we at least need one that makes elevator-riding life tenable for all tall-building dwellers. 42
  20. interchange42

    Toronto 475 Yonge Street | 255.76m | 78s | KingSett Capital | BDP Quadrangle

    12 elevators for 1,791 units? That is not good. That's 149,25 suites per elevator. There should be 9 elevators per tower, not 6. The City could allow KingSett larger floor slabs to accommodate the extra elevators, or if not, then go with 8 elevators per building but eliminate one suite per...

Back
Top