lol... yea. This project has too many unknowns and risks at play. They will run into challenge and this will be delayed far beyond 2027, likely with substantial cost overruns as well. Not to say that it shouldn't be built... but this timeline is a boldfaced lie. The government needs to stop acting as if private sector magic will make engineering constraints vanish
If Metrolinx is intelligent, they'd design this project such that the most critical segment can be operational, in case that the other segments fail to be delivered on time. In this case, that means between Pape and Yonge. The fact that there hasn't yet been any plans for a staged opening is concerning
You mean like the DRL south, which was already well on it's way? The city approach was actually the most sensible - the right project and the right technology, which the province could built off of with a northern Phase 2.
I'm increasingly losing faith that we'll ever see much intelligent decision making from Metrolinx.