Prometheus The Supremo
►Member №41+⅜◄
Member Bio
- Joined
- Apr 23, 2007
- Messages
- 4,107
- Reaction score
- 5
- Location
- a strange reality, bizarro toronto
if you had to choose for the near future between extending the sheppard subway to STC or building the eglinton crosstown LRT* to the airport (with an underground section through the narrower part of eglinton and an at grade or in trench section in the richview ROW), which would you want built?
would you sacrifice sheppard for eglinton? or would you sacrifice eglinton for sheppard?
-->keep in mind this poll has to deal with the reality that the current mayor does not want LRTs in road centre median exclusive ROWs. because of limited funds, choosing sheppard subway would most likely leave no money for the eglinton LRT.<--
*though called the eglinton LRT, it would have a tunnelled section (like a subway) which is already the plan and a trenched or at-grade section in the richview ROW (which would be a modification of the original plan). it would not use a centre roadway median to comply with the mayor's demand.
would you sacrifice sheppard for eglinton? or would you sacrifice eglinton for sheppard?
-->keep in mind this poll has to deal with the reality that the current mayor does not want LRTs in road centre median exclusive ROWs. because of limited funds, choosing sheppard subway would most likely leave no money for the eglinton LRT.<--
*though called the eglinton LRT, it would have a tunnelled section (like a subway) which is already the plan and a trenched or at-grade section in the richview ROW (which would be a modification of the original plan). it would not use a centre roadway median to comply with the mayor's demand.
Last edited: