P0per
New Member
May 23. Lots of work along the entire line, so lots of photos.
View from Highway 85 overpass on Northfield.
IMG_1092 by ION Construction, on Flickr
Northfield station forms ready for concrete pour, TPS installed and preparing for the curve onto Northfield.
IMG_1096 by ION Construction, on Flickr
Trackwork for Northern entrance/exit to OMSF.
IMG_1097 by ION Construction, on Flickr
Southern entrance to OMSF, track switch and OCS poles all in place.
IMG_1105-1108 by ION Construction, on Flickr
Catenary poles now reach the OMSF, but not yet rigged all the way. View from Weber.
IMG_1098 by ION Construction, on Flickr
Existing crossing protection reinstalled at Bearinger, with gates to come.
IMG_1114 by ION Construction, on Flickr
Gaunlet track switches now have actuators - this one from R&T Park station.
IMG_1118 by ION Construction, on Flickr
Crossovers being installed by the Perimeter Institute.
IMG_1129 by ION Construction, on Flickr
Corduroy Road gone.
IMG_1137 by ION Construction, on Flickr
Getting track ready on the curve from Caroline to Allen.
IMG_1141-1147 by ION Construction, on Flickr
Intersections by Grand River Hospital with Transit signals installed. Very busy!
IMG_1155 by ION Construction, on Flickr
Most of the track now laid in the run down the hill to CN Guelph Subdivision grade separation.
IMG_1163 by ION Construction, on Flickr
Excavation on the North side of Guelph sub grade separation, with VIA 6436 deadheading to Sarnia for tomorrow's #84.
IMG_1167 by ION Construction, on Flickr
Excavation on South side of Guelph sub.
IMG_1171 by ION Construction, on Flickr
Lots of work on Duke street. Looking South from Fredrick.
IMG_1179 by ION Construction, on Flickr
Lots of track laid on Charles on the run down to Stirling.
IMG_1187 by ION Construction, on Flickr
Trackwork on Charles towards Borden, with Borden station now poured.
IMG_1189 by ION Construction, on Flickr
Tracks on curve from Charles to Borden now laid. All trackwork is complete on Borden!
IMG_1192-1200 by ION Construction, on Flickr
Schneider Creek LRT bridge spans now complete, ready to receive rails on the decking.
IMG_1214 by ION Construction, on Flickr
Retaining walls and OCS pole footings on the hill up to the Hydro ROW from Courtland.
IMG_1227 by ION Construction, on Flickr
Rest of album on Flickr.
View from Highway 85 overpass on Northfield.
![](https://farm8.staticflickr.com/7659/26927093860_768712d432_h.jpg)
Northfield station forms ready for concrete pour, TPS installed and preparing for the curve onto Northfield.
![](https://farm8.staticflickr.com/7542/26927122100_46a461dcb4_h.jpg)
Trackwork for Northern entrance/exit to OMSF.
![](https://farm8.staticflickr.com/7287/27168333496_ffa8fd4c32_h.jpg)
Southern entrance to OMSF, track switch and OCS poles all in place.
![](https://farm8.staticflickr.com/7103/27132962471_7ec9add1e8_h.jpg)
Catenary poles now reach the OMSF, but not yet rigged all the way. View from Weber.
![](https://farm8.staticflickr.com/7562/26597098803_09133b02a3_h.jpg)
Existing crossing protection reinstalled at Bearinger, with gates to come.
![](https://farm8.staticflickr.com/7631/26927191930_d0811c1018_h.jpg)
Gaunlet track switches now have actuators - this one from R&T Park station.
![](https://farm8.staticflickr.com/7067/27105910062_2f815e94f2_h.jpg)
Crossovers being installed by the Perimeter Institute.
![](https://farm8.staticflickr.com/7343/26597252073_337c1e3273_h.jpg)
Corduroy Road gone.
![](https://farm8.staticflickr.com/7759/26595843004_8f3f3f11dc_h.jpg)
Getting track ready on the curve from Caroline to Allen.
![](https://farm8.staticflickr.com/7268/26926990950_9329473877_h.jpg)
Intersections by Grand River Hospital with Transit signals installed. Very busy!
![](https://farm8.staticflickr.com/7294/27133275731_a3ec02180f_h.jpg)
Most of the track now laid in the run down the hill to CN Guelph Subdivision grade separation.
![](https://farm8.staticflickr.com/7296/27202375315_b69ea4f0ce_h.jpg)
Excavation on the North side of Guelph sub grade separation, with VIA 6436 deadheading to Sarnia for tomorrow's #84.
![](https://farm8.staticflickr.com/7224/27202388845_8846b88268_h.jpg)
Excavation on South side of Guelph sub.
![](https://farm8.staticflickr.com/7363/27202395365_bd189b11cb_h.jpg)
Lots of work on Duke street. Looking South from Fredrick.
![](https://farm8.staticflickr.com/7027/27133409101_8df33b1d88_h.jpg)
Lots of track laid on Charles on the run down to Stirling.
![](https://farm8.staticflickr.com/7148/27106218482_ecad1e36d6_h.jpg)
Trackwork on Charles towards Borden, with Borden station now poured.
![](https://farm8.staticflickr.com/7346/27133455541_7822741790_h.jpg)
Tracks on curve from Charles to Borden now laid. All trackwork is complete on Borden!
![](https://farm8.staticflickr.com/7116/26926981040_8915bcfe2b_h.jpg)
Schneider Creek LRT bridge spans now complete, ready to receive rails on the decking.
![](https://farm8.staticflickr.com/7267/26596142134_d584024778_h.jpg)
Retaining walls and OCS pole footings on the hill up to the Hydro ROW from Courtland.
![](https://farm8.staticflickr.com/7108/27168880636_8cc87361ba_h.jpg)
Rest of album on Flickr.
Last edited: