drum118
Superstar
I have no issue leaving the tower where it is as it helps for a southbound platform while keeping the reconstruction to a medium. One way or another, the tracks have to be lower to get under the embankment and that was to happen to the current underpass if tracks ran in mix traffic for it.
I do not support delaying both extension and its the same BS I have heard for 16 years from the city. Both needs to be done at the same time with the Ontario Line having very little impact at the loop area by then.
This project is 10 years late now and time to build it. Waterfront Toronto has already screw up the Portland lines by not building all the bridges at the same time that it will cost the close to 30% more to install them now if not more. Commissioner St bridge will be very costly to assemble and install it when the need is there for it like 2030 not 2040 plus. Both sections needs to arrive at the same time to speed up the process.
I do not support delaying both extension and its the same BS I have heard for 16 years from the city. Both needs to be done at the same time with the Ontario Line having very little impact at the loop area by then.
This project is 10 years late now and time to build it. Waterfront Toronto has already screw up the Portland lines by not building all the bridges at the same time that it will cost the close to 30% more to install them now if not more. Commissioner St bridge will be very costly to assemble and install it when the need is there for it like 2030 not 2040 plus. Both sections needs to arrive at the same time to speed up the process.