News   Nov 29, 2024
 744     0 
News   Nov 29, 2024
 302     0 
News   Nov 29, 2024
 621     1 

Waterfront: Port Lands Consultation

If the area is no longer going to be industrial but rather quality parkland and dense mixed-use neighbourhoods, then the transmission towers need to go.

The east side of the Don is still employment land with higher density. With the towers in the centre of Commissioner, they have an impact of transit under Hydro One Control, as well reducing the width of the corridor for better land use.

What type of employment could be used there is another debate under other plans for those areas.

I agree with the removal of the tower regardless what goes there.
 
The length of transmission cabling that would have to be buried isn't THAT much, is it? I have no idea of the cost of such things, mind you.
 
Posted today:

Request for Quotation
ecblank.gif
Call number: 9118-16-7085
Commodity:
Professional Services, Architectural Services
Description:
Non-exclusive provision of six (6) perspective renderings of the Port Lands Framework Plan
Quotations are invited for the non-exclusive provision of six (6) perspective renderings of the Port Lands Framework Plan for the City of Toronto’s City Planning Division, in partnership with Waterfront Toronto. The renderings shall comprise a minimum of one (1) elevated / bird's eye view, a minimum of two (2) aerial views, and a minimum of three (3) pedestrian level views. Base mapping of the street network and building footprints and basic building modelling will be provided to the Vendor in digital format (.dwg and .skp or .3dm). The Vendor shall be required to provide the renderings in both digital and print format.
Issue date: April 18, 2016
ecblank.gif
Closing date: April 29, 2016
at 12:00 Noon


Scope of work:

The Vendor shall prepare a minimum of six (6) perspective renderings of the Port Lands Framework Plan, comprising a minimum of one (1) elevated / bird's eye view, a minimum of two (2) aerial views, and a minimum of three (3) pedestrian level views. A visual identity for other graphics and plans, specifically a Demonstration Plan, has been developed. The renderings will build on the palate of the Demonstration Plan to create a cohesive set of graphic materials for the final Port Lands Planning Framework document. The Demonstration Plan is provided in Appendix F for reference purposes.

3.1 Background and Context
The Port Lands is a 325 hectare area of underutilized land located on the shore of Lake Ontario in close proximity to Toronto's downtown. Created through lake filling for port related uses in the early 20th century the Port Lands are currently home to many commercial, industrial, film/creative and port dependant industries, as well as numerous heritage resources. The Port Lands represent an unprecedented redevelopment opportunity for the city and the Port Lands Framework Plan will guide its revitalization and redevelopment over the near, medium and long term. The plan applies to an area bounded by the Keating Channel and Lake Shore Boulevard East to the north, Leslie Street to the east, Unwin Avenue to the south, and Lake Ontario / Toronto's Inner Harbour to the west.

The Port Lands of the future is envisioned as a vibrant part of the city; comprised of unique districts that take their character from surrounding landscapes and wilderness areas, heritage resources, and their waterfront location as well as prevailing land uses. Given the Port lands geographic location southeast of Toronto's Downtown, its future skyline, as viewed from key public destinations along the waterfront, is an important aspect of the planning work underway. Development within the various districts of the Port Lands will be substantial enough to lend definition to the public realm, organized to locate animating uses adjacent to public spaces, and massed to provide sensitive transitions between new development and heritage resources.

3.2 Base Materials
Prior to preparing perspective renderings, the Vendor will be provided with the following mapping and modelling in digital format (.dwg and .3dm or .skp):

• Base mapping of the planned street network, proposed building footprints and the naturalization of the Don River.

• Basic massing model (see Appendix X) of existing buildings in the Port Lands and surrounding areas as needed, and conceptual built form massing for new districts. The massing model does not have the necessary building detail or architectural articulation that the Vendor will be required to prepare for all conceptual buildings. The massing model has also not integrated regrading that will occur as part of the construction of the river. The perspective renderings should graphically convey the topographic changes contemplated.

For more information on this call, please click on the viewing copy attachment in the Notes section above.
 
So how does this jive with a supposed Expo 2025 plan? The rendered buildings are complete unsuited for expo use - assume they will take over the blank portion along the water? All of this stuff would get delayed to roll out the temporary expo structures.
 
That looks pretty awesome and logical. It would be nice if they started to implement this on new developments where possible. Torontonians can learn. :)
 
That looks pretty awesome and logical. It would be nice if they started to implement this on new developments where possible. Torontonians can learn. :)

I'm not holding my breath; our planning department continues to approve plans for brand new neighbourhoods (West Donlands, East Bayfront) without essentially any consideration of cycle infrastructure, so this would be an unexpected yet welcoming change of course.
 
Could the Port Lands become a "showcase" on how suburbia should be like?

Higher density, streetcar right-of-ways (with real or artificial grass this time), segregated bicycle lanes, wide sidewalks, parking laybys instead of parking lots, laneways behind storefronts for deliveries, trees, mixed-use, etc..

2011921-portlands-streetcars.jpg


CsUq7r2UEAAJ2l3.jpg
 
I was looking at the rail network still operational in the Port Lands according to CN http://cnebusiness.geomapguide.ca/ , see my screenshot attached.

...and I was wondering, has the area been rezoned residential? Could, for example, a manufacturer start up an industrial enterprise on Commissioner St. and order freight rail service?
 

Attachments

  • Port Lands Rail.JPG
    Port Lands Rail.JPG
    104.9 KB · Views: 536
I was looking at the rail network still operational in the Port Lands according to CN http://cnebusiness.geomapguide.ca/ , see my screenshot attached.

...and I was wondering, has the area been rezoned residential? Could, for example, a manufacturer start up an industrial enterprise on Commissioner St. and order freight rail service?
Of course, the map is out of date. They removed all the rails that used to run n the middle of Villiers Street and really the only line still there is the one that runs on north side of Lake Shore before going to the Ashbridges Bay water plant (this has one train a week) and the line that branches off this and runs past the Hearne and along Unwin to the Ports Toronto area just west of Cherry Beach. (This line was repaired about 3 years ago but, as far as I can find out, has never seen any traffic since! I asked the Toronto Portlands Corporation what the repairs had cost and how much use there was and was told that this is a commercial secret but they were obligated to provide a functioning rail line!)
 

Back
Top