DSC
Superstar
Member Bio
- Joined
- Jan 13, 2008
- Messages
- 19,763
- Reaction score
- 28,535
- Location
- St Lawrence Market Area
This on Metrolinx site gives a bit more info on what is planned.
What is happening?
Proposed date: Weekend of May 25th– 26th: Parliament Street will be closed in both directions between Lake Shore Boulevard E to north of the rail corridor to facilitate the installation of a utility bridge that will be installed on the south side of the rail bridge.
Proposed date: Weekend of June 1st– 2nd: Cherry Street will be closed in both directions between Lake Shore Boulevard E to north of the rail corridor to facilitate the installation of a utility bridge that will be installed on the south side of the rail bridge
What is happening?
Proposed date: Weekend of May 25th– 26th: Parliament Street will be closed in both directions between Lake Shore Boulevard E to north of the rail corridor to facilitate the installation of a utility bridge that will be installed on the south side of the rail bridge.
Proposed date: Weekend of June 1st– 2nd: Cherry Street will be closed in both directions between Lake Shore Boulevard E to north of the rail corridor to facilitate the installation of a utility bridge that will be installed on the south side of the rail bridge