44 North
Senior Member
wait wth. Is that a wraparound ad, or are we now painting the TR's red? Hope so cuz it looks phenomenal. Looked like a u-bahn or s-bahn in Hamburg or something.
It was a partial wrap of the train I think it was only the middle four cars that were wrapped as apposed to the whole trainwait wth. Is that a wraparound ad, or are we now painting the TR's red? Hope so cuz it looks phenomenal. Looked like a u-bahn or s-bahn in Hamburg or something.
Has there been any developments on the possible sale of some Orion 7s to NY MTA? Is that dead or just sleeping?
That's the Heath Street entrance
The TTC doesn't seem to fancy using temp tracks much. Maybe something about the weight of the CLRVs/Flexities? The bottom line is whether TIFF should get to close one of the principal streets in Toronto in both directions for that length of time. I would argue - no, they shouldn't. At most, they should get the north side of the street and allow transit traffic to operate on the south side. If they want a plaza for their annual beano, well they should have recessed Lightbox's streetwall from King.It bugs me that the city and the TTC is ever so slowly removing streetcar tracks. Instead, they should be installing detour streetcar tracks.
The latest example is for TIFF. Instead of allowing the streetcars to row slowly through, they are detouring them very wide, and using buses for the short comings. The city and the TTC should be installing tracks that would allow the use of streetcars instead of buses around detours.
From link.