Toronto XO Condos | 53.64m | 14s | Lifetime | Core Architects

July 12 and July 19

July 12.jpg


July 19.jpg
 
Last edited by a moderator:
Aug 19
Part is at grade and working for the first floor with the rest at grade in Sept
51397196324_470cdce014_b.jpg

51397473815_056d093c8b_b.jpg

51397196204_08efe0ef2d_b.jpg

51395698492_6c9d6a7195_b.jpg

51395698357_d1cf9cee0e_b.jpg

51395698257_5d1a86ea25_b.jpg

51397195879_e3f2cc39f4_b.jpg

51396722208_2f8170a2c8_b.jpg
 
Feb 28
Only a few places open in the plaza for OX2 and their days are number until they close.

51922743420_16992ec532_b.jpg

51922455614_b1b48285aa_b.jpg

51922121831_124919660d_b.jpg

51921152087_c204619f7d_b.jpg

51921152142_02742a80a3_b.jpg

51921152337_946da0871a_b.jpg

51922122266_4d93e31206_b.jpg

51922744085_c8712a8b38_b.jpg

51921152612_da5a11d5d0_b.jpg

51922122511_61c40d6698_b.jpg
 
It's really starting to have quite a presence in the area.

On the north/west corner walls/supports have been poured for the 7th floor with some forms for the 8th floor in place (first shot)

850_3430.jpg
850_3435.jpg
850_3436.jpg
850_3439.jpg
 