Toronto XO Condos | 53.64m | 14s | Lifetime | Core Architects

From just now.

KOT_2103.jpg
KOT_2104.jpg
 
From today.
The last picture shows the mobile crane they've been using. I was told they have a leak that is preventing them from erecting the regular crane.

KOT_3591.jpg
KOT_3592.jpg
KOT_3593.jpg
KOT_3595.jpg
 

Back
Top