Toronto Waterworks Building Redevelopment | 47.55m | 13s | MOD Developments | Diamond Schmitt

45110F65-97DB-4FBF-B8ED-B541CD6E144D.jpeg
CEA799B3-B824-4093-85EF-9D6340AACAAD.jpeg
790EDBB7-09CD-4C82-91FE-050FC472C2CC.jpeg
1CB27013-720B-4129-BD81-5A2F1020CBFE.jpeg
 

Attachments

  • 45110F65-97DB-4FBF-B8ED-B541CD6E144D.jpeg
    45110F65-97DB-4FBF-B8ED-B541CD6E144D.jpeg
    327.3 KB · Views: 2,153
  • CEA799B3-B824-4093-85EF-9D6340AACAAD.jpeg
    CEA799B3-B824-4093-85EF-9D6340AACAAD.jpeg
    333.6 KB · Views: 2,154
  • 790EDBB7-09CD-4C82-91FE-050FC472C2CC.jpeg
    790EDBB7-09CD-4C82-91FE-050FC472C2CC.jpeg
    275.6 KB · Views: 2,189
  • 1CB27013-720B-4129-BD81-5A2F1020CBFE.jpeg
    1CB27013-720B-4129-BD81-5A2F1020CBFE.jpeg
    321.4 KB · Views: 2,240
Does anyone know what is happening the portion of building that remains on the East side of the site? Specifically, does the charity that houses that space remain, or will it become condo amenities or something similar?
 
Eva's Phoenix will remain in place. That part of the property was severed and a limiting distance agreement was secured to allow Waterworks to go ahead within the required setbacks above.
 

Back
Top