Automation Gallery
Superstar
^^The developer is supposed to pay for part of the alterations required to lower noise, etc.
Makes sense.
^^The developer is supposed to pay for part of the alterations required to lower noise, etc.
congrats on your purchase!
i got a unit in phase ii as well... 5th floor, 630sq ft. in the far east building. i got in during the initial open house back in november 2007. i found UT the same way you did...
the last time i checked was last summer... and units with the same square-footage, on higher floors, but closer to queen's quay, where going for 30-40k more than what i paid. i don't know if it's changed since then, for better or worse.
^ I would vote for M5V's presentation centre