drum118
Superstar
That statement doesn't exactly inspire confidence.
I can tell you from first hand dealing on the Waterfront EA and design, TTC and the City try everything they could to kill transit on one side, as well drown grade the whole thing.
With very little funding coming from the city for the Queens Quay first phase of construction, as well Cherry St, TTC will be designing their system as cheap as possible. TTC even rule out grass in the ROW for all kinds of reasons, as it would add to the cost of building it.
WT was a strong backer on both lines, but in the end $$ do the talking with WT being not happy about it.