Northern Light
Superstar
Much smaller update this time, not a lot of visible progress since last time, but some.
Photos taken Sept 11th, 2022:
Since north of the tower is essentially complete, we'll start on the south side of the tower:
You can see in this next one an additional granite seatwall vs what we saw last time, in front of the old observatory:
Next a 3 pic series to rant about poorly thought out design, especially galling on a project w/this budget. Not one, Not two, but three styles of pedestrian light fixture, all within the same block, on the same street!
On the photo above..........may we add................."What tree protection zone?" On a tree that size, this equipment is parked right on the tree roots........
***
****
Here's one new bit, they've begun excavating the sidewalk on the south end of Hart House Circle/Park:
Photos taken Sept 11th, 2022:
Since north of the tower is essentially complete, we'll start on the south side of the tower:
You can see in this next one an additional granite seatwall vs what we saw last time, in front of the old observatory:
Next a 3 pic series to rant about poorly thought out design, especially galling on a project w/this budget. Not one, Not two, but three styles of pedestrian light fixture, all within the same block, on the same street!
On the photo above..........may we add................."What tree protection zone?" On a tree that size, this equipment is parked right on the tree roots........
***
****
Here's one new bit, they've begun excavating the sidewalk on the south end of Hart House Circle/Park: