Developer: RioCan REIT, Allied Properties REIT, Tridel, Woodbourne Canada Management, Inc.
  
Address: 410 Front St W, Toronto
Category: Residential (Townhouse, Market-Rate Rental, Condo), Commercial (Office, Retail), Public Space / Park
Status: CompleteCompletion: 2023
Height: 571 ft / 174.03 mStoreys: 46 storeys
Project Forum 6.9K posts
Real Estate Forum 24 posts
Follow 58 followingUpload 10886 photos
Official WebsiteReport Error


Developer: RioCan Living, Woodbourne Canada Management, Inc.
  
Address: 450 Front St W, Toronto
Category: Residential (Market-Rate Rental)
Status: CompleteCompletion: 2024
Height: 516 ft / 157.40 mStoreys: 46 storeys
Project Forum 6.9K posts
Real Estate Forum
Follow 2 followingUpload 0 photos
Official WebsiteReport Error


Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

There's sometimes a push to enclose certain sections of a building before the winter, but it's usually not necessary. The bigger weather concerns for glazing are wind and moisture. It doesn't take a lot of wind to make hoisting dangerous, and any surfaces to be caulked need to be basically perfectly dry (so rain and frost are problematic). For small sections of caulking you can use heat guns or tiger torches to dry things out (depending on how it'll affect the surface finishes), but it's usually easier just to shut things down if there's a steady rain going on.
 
There's sometimes a push to enclose certain sections of a building before the winter, but it's usually not necessary. The bigger weather concerns for glazing are wind and moisture. It doesn't take a lot of wind to make hoisting dangerous, and any surfaces to be caulked need to be basically perfectly dry (so rain and frost are problematic). For small sections of caulking you can use heat guns or tiger torches to dry things out (depending on how it'll affect the surface finishes), but it's usually easier just to shut things down if there's a steady rain going on.
So knowledgeable
 
Dec 2, 2021

Main canopy progress.

A24E0D9F-C339-4E14-ADB9-6F9DFCBA9B5A_1_201_a.jpeg



5398454E-F026-4641-99C6-A6E07158AF3F_1_201_a.jpeg



5CC37E71-12DE-4F86-BA50-58E831B1836D_1_201_a.jpeg



7D8780B2-474B-4F81-B690-482E30D2756C_1_201_a.jpeg



E77D0726-E99D-4DC8-9D29-2D13CA1AC8D6_1_201_a.jpeg



A7427470-16A1-4688-933B-45F223392277_1_201_a.jpeg



114CC566-7F12-4397-9FBF-5F26E467DC82_1_201_a.jpeg


Studs/hooks for the south portion of the canopy installation.

ED46C0CD-D8F6-494B-AD70-28F35F4C4305_1_201_a.jpeg



5E563DCC-A546-4F21-B22B-6DC8A10DF04A_1_201_a.jpeg


Studs/hooks for the north portion of the canopy installation.

BCAD2CA2-C7AD-4999-B990-BA227BF095FF_1_201_a.jpeg



A6CB8A8F-969F-4750-AFC2-C1CE4F80AC38_1_201_a.jpeg


To the east.

3CB5119F-F9D2-4BC3-B404-69331F5A0D35_1_201_a.jpeg
 
Last edited:
1 alarm fire (level 1 stands for working fire response, many units are specified being on hand) - Outside Storage facility (from the city's live feed) as of now.

Likely improper storage. Hopefully only minor damage. Weird amount of issues around this site lately, but being how complex it is I could see these issues popping up.
 
Last edited:

Back
Top