Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

Pic taken May 16, 2018


Zswbtjv.jpg
 
Second Ellis Don crane up today for the office tower.

View attachment 143778

The new crane is for the tallest residential building. It shares a podium with the office tower up until the sixth floor, and then splits into the two separate towers. I believe Ellis Don is building the shared podium but then Deltera will take over for the residential tower.
 
The new crane is for the tallest residential building. It shares a podium with the office tower up until the sixth floor, and then splits into the two separate towers. I believe Ellis Don is building the shared podium but then Deltera will take over for the residential tower.

Are you sure it is for the Residential tower? I don't believe we have heard of a sales centre or anything have we? I agree it will be used for the basement and podium levels though.
Please correct me though.

Cheers,
 
Are you sure it is for the Residential tower? I don't believe we have heard of a sales centre or anything have we? I agree it will be used for the basement and podium levels though.
Please correct me though.

Cheers,
I find it difficult to believe it is for the east residential tower as well. That excavation is not even done yet. I’m sure someone can post the site plan and it will all be clear.
 
I find it difficult to believe it is for the east residential tower as well. That excavation is not even done yet. I’m sure someone can post the site plan and it will all be clear.

You make a good point. And I should have said "I think" this crane is for the residential tower, not asserted this as a fact. The garage goes down to P6 under the east residential tower so how could this be the crane for that? It's sitting on P4. Here is the P5 plan. I have highlighted about where I think these cranes are based on the pictures.

I have heard on good authority that there will be one crane for each building (7) plus two for the canopy = 9 total. But this new crane on site doesn't seem to fit that idea.

upload_2018-5-17_13-34-8.png
 

Attachments

  • upload_2018-5-17_13-34-8.png
    upload_2018-5-17_13-34-8.png
    269.2 KB · Views: 564

Attachments

  • 20180517_121553_resized_1.jpg
    20180517_121553_resized_1.jpg
    286.5 KB · Views: 587
  • 20180517_121559_resized_1.jpg
    20180517_121559_resized_1.jpg
    368.1 KB · Views: 550
  • 20180517_124433_resized_1.jpg
    20180517_124433_resized_1.jpg
    368.3 KB · Views: 575
  • 20180517_135103_resized_1.jpg
    20180517_135103_resized_1.jpg
    209.7 KB · Views: 528
They finish installing the 2nd crane today and one of the last 2 cranes to be had. One of the crane suppliers has order 10 new ones. Give it another month or 2, at least 6 will be remove from a number of sites. Given the number of cranes that have come down this year, surprised on the shortness of them.

400 trucks a day are moving the dirt and the last load will be in Sept.
Photos to follow.
 
May 17
First tower is supposed to be block F at 46s
42237650241_1e9a9303c2_b.jpg

27366777577_ae0dcedabe_b.jpg

42237654661_847669878b_b.jpg

42237658821_be573b656c_b.jpg

42237661981_5e553b70a2_b.jpg

42237669621_114a1fa2ae_b.jpg

27366787697_e84070d380_b.jpg

42237674331_7570a3084f_b.jpg

27366791787_a557a618fb_b.jpg
 

Back
Top