Toronto The Well | 174.03m | 46s | RioCan | Hariri Pontarini

Was told last week when shooting the site, the crane in between the buildings is not going to be tall and it has to be anchor down nightly as it cannot swing in the wind like the other ones without hitting the building. The crane is for the precast for the next 12-18 months.
 
April 14, 2021:

IMG_0223.jpeg
 
April 10
Lot more up on site
This is the crane the cannot swing and must be anchor down at night. As you can see there are 4 cables that anchor the crane down.
51119743842_2fbc69e51c_b.jpg

51119741372_c370d5d4ac_b.jpg

51120225693_db728251c5_b.jpg

51119743407_720a680666_b.jpg

51121109650_d3c65fa119_b.jpg

51120318001_a41c085f6c_b.jpg

51120064389_67dd81401c_b.jpg

51120226233_e5391e5c36_b.jpg

51120226278_d0ac2a249e_b.jpg

51120064744_7288932569_b.jpg

51120226718_141075d613_b.jpg

51120223593_c55f6c3fc1_b.jpg

51119741462_a674552916_b.jpg

51120223973_2f36455718_b.jpg

51119741967_de74476182_b.jpg

51119742272_61725c2c27_b.jpg
 
Curiously, there's only one near close-up of the Wellington frontage in nearly 70 renderings of this project in UT's database. It shows an alternating white pre-cast and brick cladding on the lower levels, as supposed to the actual built form (all-brick frontage). The 4 buildings also seem to have more varied frontages (eg. grid on the first white building on the left, vertical 'columns' on the third).

9439-81214.jpg


Picture from the database.
 
Curiously, there's only one near close-up of the Wellington frontage in nearly 70 renderings of this project in UT's database. It shows an alternating white pre-cast and brick cladding on the lower levels, as supposed to the actual built form (all-brick frontage). The 4 buildings also seem to have more varied frontages (eg. grid on the first white building on the left, vertical 'columns' on the third).

View attachment 313958

Picture from the database.
43228-127435.jpg

39211-130317.jpeg
 

Back
Top