As the residential, commercial and retail buildings rise around it, one section of The Well includes the excavation of a deep cistern near the centre of the site. Though still under construction, the top edge of the cistern already sits 150ft below ground level and is designed to go even further. Just past the guardrail, currently 100ft down, there are two excavators breaking rock to be hauled off-site. Despite the depth, the team is just only two-thirds of the way through their work. Once complete, the well will be 260ft deep and be situated only 14m above sea level.