Not much progress. I passed by the site yesterday for the first time in more than 3 weeks, and didn't bother to take pictures because it looked pretty much the same as the last shots I posted here. 7 floors on the south side (Selby St) and 3 floors on the Bloor side. At the rate it's going, it should be done by 2030.Any latest photos for this everlasting project?
Thx.Not much progress. I passed by the site yesterday for the first time in more than 3 weeks, and didn't bother to take pictures because it looked pretty much the same as the last shots I posted here. 7 floors on the south side (Selby St) and 3 floors on the Bloor side. At the rate it's going, it should be done by 2030.
If it’s anything like the other Gupta projects, the bar is set very low.Creeping above my line of sight. Nervously waiting for the first sign of cladding.
View attachment 288008
From yesterday. The Selby side has reached 9 floors (no idea how tall it's supposed to be, since there's no renderings of this section in the database).
View attachment 289625
the Selby pavilion is going up to 10 storeys - almost topped out...From yesterday. The Selby side has reached 9 floors (no idea how tall it's supposed to be, since there's no renderings of this section in the database).
View attachment 289625
... and it's intended to have a green roof, and outdoor and pet amenities up there...From yesterday. The Selby side has reached 9 floors (no idea how tall it's supposed to be, since there's no renderings of this section in the database).
View attachment 289625