Toronto The Parker | 123.13m | 39s | Fitzrovia | Graziani + Corazza

And by that it’s the only competent building they have done.

Also, don’t count your chickens before they have hatched. This one isn’t done yet, lots of time for G+C to screw it up still.
It's possible, sure. But we'd be talking a late-stage collapse on a level not seen by Torontonians since the Leafs-Bruins series in 2013
 
Just topping out. Taken this on March 27th.

17777C60-33F2-46C0-BF53-D0D9CCE90A63.jpeg
 


20210407_000802.jpg
 
Maybe it's more the developer in this case willing to shell out for a better design? I'm sure most major arch firms could design a nice building if given the funding. Or is this blasphemy when we're talking about Grim & Crap?
The point being that having been given a reasonable budget for the exterior, Graziani + Corazza have risen to the challenge. That said, architectural drawings of the podium indicate that we are likely getting spandrelacious crap down at ground level.

42

EDIT: And there's @ProjectEnd posting that just now. Not too many mullions indicated though.
 
I'm still waiting for the bad stuff to come out like Rudy's dye job as Mr. End once put it... >.<
 

Back
Top