I don't see how they're going to 94 floors without approvals. They're only allowed up to 91 currently, right?
Knowing Mizrahi, I wonder how much, outside of the application, was actually done in terms of work to actually get it to 91 floors. Like, I'm wondering if they've actually done the engineering/construction/HVAC drawings or if they just got approvals and left it at that. If so, I doubt Hana Bank has an appetite for any development work outside of just handing the construction off to SG and hoping it gets topped out asap.
Knowing Mizrahi, I wonder how much, outside of the application, was actually done in terms of work to actually get it to 91 floors. Like, I'm wondering if they've actually done the engineering/construction/HVAC drawings or if they just got approvals and left it at that. If so, I doubt Hana Bank has an appetite for any development work outside of just handing the construction off to SG and hoping it gets topped out asap.