Photos taken today, Good Friday (Mar. 29). Since my set of photos last Friday, the blue forms on the east side have moved up one level, as they work on level 56 or 57 at the top, level 57 would be the first floor of the 3rd mechanical level. The corner blue forms have moved up as the corners are quickly poured, I think they are on level 46 there. The black Rail Climbing Systems are all at the same levels as last week, and we now have the first piece of cladding installed above the first mechanical level (at least, the first one we can see), on the south face, floor 19.
Starting with my Flickr "time lapse" album addition, to the view from the south including that single piece of cladding on level 19, to a look at the 1st mechanical level from Yonge just north of Bloor. A glimpse of the scaffolding that appeared last week on the Bloor sidewalk, presumably for a retail outlet? Then, views from in front of Holt Renfrew, at Bloor west of Yonge, and from across Balmuto street, immediately west of the tower. Shots from Cumberland east of Bay, and a final shot from Bloor and Howland or so (two blocks east of Bathurst).
From October, 2020, as above-ground construction started in earnest at The One (1 Bloor W.) in Toronto. More or less a weekly photo usually taken on a Friday, with some gaps during early-on construction hiatuses. The initial photographs are from 2015, during demolition at the site, 2018, during...
www.flickr.com
View attachment 552184View attachment 552180View attachment 552181View attachment 552182View attachment 552185View attachment 552183View attachment 552188View attachment 552189View attachment 552179View attachment 552187View attachment 552186View attachment 552178