jer1961
Active Member
First two pieces put up this afternoon, Tuesday (April 4). Seems to be two parts of a three-part section. A crate pictured below holds the three parts presumably for the mirror section on the east side, or maybe the nw corner which has the insulation already in place. Another crate shows multiple longer pieces, maybe for the centre panes on the level here and the fifth level, two to a section?
Last edited: