Some crane parts getting hauled up this evening:

20240808_195207.jpg
20240808_195225.jpg
20240808_195245.jpg
20240808_195255.jpg
 
Photos taken today, Friday (Aug. 9). Since my post last Friday, movement at the top, the blue scaffolds up a level as work gets up to level 65 or 66. The crane has been raised another segment, the new brace at level 60 in place, and two lower braces now removed. The corner scaffolds remain at the foot of the third mechanical level, and the black Rail Climbing Systems remain where they were last week installing the skin at level 37, 36 and 36 for the east, north and west ones, respectively.

After my Flickr "time-lapse" album addition, views from the south, on Dundonald east of Yonge, then from Yonge Street around there. More shots of the crane and attachment points, then the view from in front of Holt Renfrew including a view of work at the first mechanical level, from Bloor west of Yonge. Shots from Cumberland, east of Bay, next the view from Bloor at Bedford, where 1 Bloor W almost now obscures 1 Bloor E, and finally from down Devonshire.


UTIMG_6092.jpg
UTIMG_5958.jpg
UTIMG_6000.jpg
UTIMG_6009.jpg
UTIMG_6037.jpg
UTIMG_6059.jpg
UTIMG_6222.jpg
UTIMG_6245.jpg
UTIMG_6175.jpg
UTIMG_6153.jpg
UTIMG_6283.jpg
UTIMG_6292.jpg
 

Back
Top