Toronto The Madison | 121m | 36s | Madison Group | Kirkor

Been following this since breaking ground and happy to see it coming along nicely, although quite slow. Looks great imo, not too flashy and not too drab, can't wait to see my unit. Thanks to all those who've posted pictures and the live webcam feed.
 
Sidewalk is open..a few from tonight:

IMG_20160603_202720488.jpg
IMG_20160603_202311395_HDR.jpg
IMG_20160603_202559072 (1).jpg
IMG_20160603_203719727.jpg
 

Attachments

  • IMG_20160603_202720488.jpg
    IMG_20160603_202720488.jpg
    2.6 MB · Views: 2,057
  • IMG_20160603_202311395_HDR.jpg
    IMG_20160603_202311395_HDR.jpg
    1.8 MB · Views: 1,972
  • IMG_20160603_202559072 (1).jpg
    IMG_20160603_202559072 (1).jpg
    254.3 KB · Views: 1,880
  • IMG_20160603_203719727.jpg
    IMG_20160603_203719727.jpg
    2.5 MB · Views: 2,014
Thanks for the pics. Actually, at street level, it doesn't look too bad, as long as you don't look up. Loblaws will bring lots of people to the sidewalk and hopefully some nice trees will soften the view of the building.

I wonder-- does the sidewalk design here account for Eglinton Connects, or will it be ripped up in a few years? The draft maps show the protected bike lane being on the outside of the existing sidewalk area, so maybe it has been accounted for.
 
Canada Day

From Bayview:

IMG_20160701_132737.jpg
IMG_20160701_111830.jpg
IMG_20160701_111657.jpg
IMG_20160701_111147.jpg
IMG_20160701_111144.jpg
IMG_20160701_111503.jpg
 

Attachments

  • IMG_20160701_132737.jpg
    IMG_20160701_132737.jpg
    473.7 KB · Views: 1,554
  • IMG_20160701_111830.jpg
    IMG_20160701_111830.jpg
    969.1 KB · Views: 1,726
  • IMG_20160701_111657.jpg
    IMG_20160701_111657.jpg
    751.1 KB · Views: 1,571
  • IMG_20160701_111147.jpg
    IMG_20160701_111147.jpg
    796.8 KB · Views: 1,519
  • IMG_20160701_111144.jpg
    IMG_20160701_111144.jpg
    820.5 KB · Views: 1,519
  • IMG_20160701_111503.jpg
    IMG_20160701_111503.jpg
    2.2 MB · Views: 1,585
Here is a screen grab from the construction webcam. They appear to be putting up the Loblaw sign.

loblaws.PNG
 

Attachments

  • loblaws.PNG
    loblaws.PNG
    626.2 KB · Views: 1,442
Last edited by a moderator:
Loblaws isn't open yet - hard to tell from the street how finished it is. I think occupancy is set for December
 

Back
Top