The exposed concrete on the east side beside the Chelsea has been covered up (forgive the blur)
20181029_092956.jpg
 

Attachments

  • 20181029_092956.jpg
    20181029_092956.jpg
    274 KB · Views: 2,900
I expect the metal destinations screen in the pass-through was much more expensive and ate up far more of the budget. The snowmen strike me as a 'what to do with the leftover cash' project.

42
 
I have trouble believing that particular piece of art is worth 1% of the building cost.

AoD

I've been floored by the costs of public art installations across the country too many times. The building has a lot of square footage but, it's not a high budget building. How much is 1%?
 