Taken March 25-2024. This is moving along nicely. As far as I can tell, shoring/excavation started about 2 years after Uovo residences beside it, to the north, and yet it has reached podium and the next floor above the podium has started, so pretty sure structure, at least, will be complete before occupancy starts next door.