Toronto T3 Bayside | 42m | 10s | Hines | 3XN

C2EF629E-9BF0-407C-B092-E10BDC9E79AE.jpeg
4018C773-3AD1-4E92-B05A-726D63467386.jpeg
 
Excited to see these two rise. Will make a great addition to the area and nearly complete the East Bayfront.
 
It's March now and photos shows the footing in progress. I can see the ground floor levels being at grade before October 2021 construction projections. As seen on the previous page .
 

Back
Top