Looks like they will be pouring the east side of the main sixth floor slab tonight. Framing for the slab for the ramp to the seventh floor is up, as is some of the framing for the slab on the west side of the seventh floor.
The slab for the ramp to the 7th floor has now been poured and the framing for the 7th floor slab is in place at the west end and two thirds of the way to the east end.