41stfloor
Active Member
They are getting ready to pour the north east third of the fourth floor. It's quite amazing how much conduit is in the floor in addition to the tensioning cables and rebar. The forms are already in place for the ramp to the fifth floor. Usually the ramp is poured within 3 or 4 days after the prior floor section is poured. See photo: