Stay off St Clair unless you have 30 or minutes to waste. Stay off 89 and 41 and find away to connect with them north of St Clair or a better way to get to where you want to go.
Videos as highlighted.
Stay away from St Clair from Caledonia to Keele for the next month as the eastbound lanes are close with single lane in the westbound lanes.
Major water work is taking place.
The existing bridge sidewalks will be remove to allow a 2nd lane to be put in. New tunnel under the tracks and on the other side of the bridge support. I have said this should happen from day one.
The 2nd area is between Winona and Oakwood that is a bottleneck as waterline work is taking place there now. The intersection on the north was a mess.
For a
project that was moving gang busting a few weeks ago, it is crawling now. 65% of the rail is in place between Winona to Vaughan with 35% having top coat.
The intersection at Kendrick Ave where the Fire Hall is is close and no work taking place to get it open ASP.
I gave up waiting for a eastbound 512 at Oakwood after 10 minutes or 15 minutes after seeing last bus as well seeing 5 westbound buses in a pack.
I walked over to Dufferin and still saw no eastbound bus other than the one that was sitting with its flasher on west of Glenholme. It was sitting there while I was at Oakwood. There was another sitting across the street from it also going west with flashers on. There was over 30 minutes gap and only saw another eastbound as I was going south on 29.
I when backup around 5pm to try to shoot the ROW going west.
It took an extra
6 minutes to get to Dufferin from Bathurst cause by the mess at Oakwood.
It was disastrous west of Caledonia Rd. It took us 35 minutes to go from Caledonia to Keele.
The driver said he has only 21 minutes to do the run and this trip put him down 45 minutes.
Even 89 and 41 was a disastrous as I saw 2 89 and 2 41 trying to go north as a convoy just north of the CP overpass with traffic backup south of Dundas from St Clair.
Southbound on Old Weston Rd was backup as far as Roger Rd.
Dufferin
PhaseIII
Welding of rail is taking place west of Keele St and the truck was leaking badly with sand around the wheels. The rail is being store west of the loop.