Interesting news! Does Oshawa have the population/growth for a Sq1 sized mall in that area? Will it be close to the expanded 407?

It will come in at over 1 million SF, and they are calling it a hybrid centre (mix of walkable core area, surrounded by bigger box-type retail uses). It won't be a mall per se, and yes it's going to be right at the expanded 407 east at Simcoe in north Oshawa).

http://www.google.ca/url?sa=t&rct=j...-4_0GRsCMR9D68HpA&sig2=-N56Qqyo6K9qZrCk5P8BwQ
 
It's called a "Power Centre" and I think Canada's climate is better served with the enclosed mall concept. The current winter that never ends is a good example why. (IMO)

null.jpg
 
These posts about Oshawa probably belong in a separate thread. If there isn't one already maybe it should be created?
 
Those slats are really classy looking, but I think they should have changed the glass, as it's really busy/cluttered looking with all the lines now.
 
The main entrance from the mall to the bus terminal will close June 2 night and not reopen until the new one is built next year.

I expect to see the parking lot close being July since most store below are not moving until the end of June that still exist today there.

Most of the skylight will be finish by the end of the month with the railing on the 2nd floor done by July.

All the floor tiles in the food court is being remove with new ones to be place.

They are starting to put the trim work on the columns by Target.

Steel work is in place for the new escalators in the centre area and waiting for them there as well where the other ones were in the central mall corridor. The strike will have an effect on these ones.

Have not receive any plans for this first expansion as yet as thing are still being change and not finalize yet.
 
So how will people get to the bus terminal from the mall? Through Target? That will be a disaster for Target!
 
So how will people get to the bus terminal from the mall? Through Target? That will be a disaster for Target!

Its either Target, Sears or walking over to the east entrance.

Target may hope to generate more customers with this detour if the lack of customers is as bad as I think it is for that store.

Haven't been back since it open, but will have to use it to get to the mall in June.

They may built a cover walkway beside Target after they remove the police station and the current walkway cover since this will be where the new hallway will be for the extension in the first place. It could be ready by August.

They may either knock holes in Target wall where the steel columns are now so the new roof support can tie into them or put a new row of columns beside the existing wall. With the overhead protection in place, it will allow crews to do their work during the day.
 
with by law for Main Street district of the downtown core being established the the Holts expansion hardly fits with the city vision of Mainstreet..just another
expansion of the shopping centre that is already too big!!
 
There was a committee of a adjustment hearing on May 16 that I fail to noticed. Only saw a sign posted by Walmart, but never got near it until May 22 when I saw one by the bus terminal for the first time. No big deal with this change.

The application was to reduce the 75% glazing to 51% along with reducing the height from 3 storey to 1 & 2 storey.

The expansion area from the current entrance.
8793246969_1f388cbe90_b.jpg


8803814290_9cdd901dc8_b.jpg
 
Phase 2 of sq one redevelopment will start June 3. Traffic being redirected to Target and entrance between Sear and Walmart. Old Navy relocated to new section making room to build new Holt Renfrew at previous Old Navy location.
image.jpg
 

Attachments

  • image.jpg
    image.jpg
    89.3 KB · Views: 1,385
The store on the right looks like the signage says either Pottery or Burberry. I don't see a Barn, so it must be Burberry.

I don't know why they didn't extend the mall right out to the street, and build an underground tunnel to the bus terminal instead? Unless it's because they're going to change the terminal in the future.
 
That rendering is opposite to what was presented at the first committee hearing.

The building ran flush with Sq One Dr and took up all the existing parking lot with a wide sidewalk there.

The build is less than 50% now than the first one.

Can't built a tunnel as it too costly and no room in the bus terminal for it as well another elevator. Can't use the existing one as you would have to rebuilt it and that would fly in the face of council since they are pro active on accessibility.
 