Was right about a bridge going between the 2 buildings over Sq One Dr.
Safe to say ModS 4/5s building depending how you class the base floor.
2 Large truss were installed today for a Plus 30 Walkway bridge. Had some fun getting the 2nd truss in place as the hording was in the way at the south end and you could hear the chucking sound as the truss was moved into position and pushing the hording out of the way.
Both trusses were assembly on site as bolted member.
The steel and decking in place for the first 2 of 4 floors for the south end. The floor slab for the north section is 98% complete to the point the forming material being remove from site.
It amassing that Bondfield can have crews working on this site, but can't find them for the 2 GO Stations that they are late on already.
Photos to follow when I finish rebuilding a number of systems that have crash in the last 48 hours and reinstall the software. Really hate 8 & 8.1