Toronto Ryerson Student Learning Centre | 50.59m | 8s | Ryerson University | Zeidler

Snapped last night on my cell; ads are finally down and looks like this will open very shortly!
2016-02-10 19.03.09.jpg

2016-02-10 19.03.40.jpg
 

Attachments

  • 2016-02-10 19.03.40.jpg
    2016-02-10 19.03.40.jpg
    719.7 KB · Views: 1,707
  • 2016-02-10 19.03.09.jpg
    2016-02-10 19.03.09.jpg
    638.7 KB · Views: 1,747
Looks really good. The windows have been papered up for so long, that this is such a nice change to see some animation at street level.
 
It's always been ratty, never really looked the way anyone would wish it did. Meanwhile, about those doors:

The project is expected to last 10 weeks, from June 19 to August 28, 2017.

With your needs in mind, the new entrance doors will:
  • Be lighter, making them easier to operate
  • Moderate airflow, enhancing temperature control in the SLC
  • Be more sustainable, adapting to the SLC’s high use frequency
42
 

Back
Top