If you look at the last photo in posting 131, that is not what there on Friday.

They are doing the steel caisson along the east side now. Saw no sign of the first one and why the change? Could be it was put on the wrong side by mistake as noted in the above photo.
 
Pic taken Oct 25, 2011


T8WJM.jpg
 
Looks like the first crane for the Quartz / Spectra site was installed today.
 