Toronto Pinnacle Toronto East | 99.47m | 30s | Pinnacle | Arcadis

Today

DJI_0102_stitch222.jpg
 
According to the city "City-owned and managed stormwater management facility".

By the way anyone know why they switched to white brick? The earlier materials showed red.
 
It's unpainted precast concrete panels with a stamped brick pattern.
 
I was curious as I thought it was a bait and switch from the renders. The white looks too pasty and almost like they wanted to match the pale drab of the tower beside it.
 
No way these are ready by November.

Maybe next summer by earliest.

Also concerned about the brick pattern color now, doesn't match the renders and not sure how they would paint them you would need scaffolding or the window washing system to be installed(meaning the buildings would already be complete)
 
April 26
More up on my site

No way this will be done this year and maybe top off come Oct.
53693291819_3fb8715cb2_b.jpg

53692055827_0aa2ca12dc_b.jpg

53692055722_40659f9b87_b.jpg

53693153918_19fa383aeb_b.jpg

53693153663_6de5de65ae_b.jpg

53693291504_561bc1104a_b.jpg
 
Last edited:

Back
Top