Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

59 actually, that's 26 to go. Whereas this project still has 99 floors to go, and if one shall happen to fall... /shrug
 
If The One started construction sometime in 2017, and approximately reached 100 meters in 2023, and is currently almost at 200m(?), and Pinnacle SkyTower started sometime 2020-2021, and is almost at 100 meters in 2024, it might catch up. The One took 6 years to reach 100 meters, while SkyTower only took 3-4(?) years to reach 100 meters. However, The One has accelerated in construction speed, because to reach another 100m, it only took 1 year. SkyTower is also speeding up, now that we’ve reached the residential floors. Just in January this year, it was around 40-50m. In half a year, we’ve seen half of 100m added. We’ll see where the race for Canada’s tallest building goes.

I also think The One will pick up the pace quite a bit in the next little while as IIRC, they are almost finished the next mechanical level.
 
Tuesday morning.

1000008497.jpg
 
June 5.
27 floors up.

IMG_2451.jpeg


IMG_2448.jpeg



IMG_2448.jpeg



IMG_2448.jpeg


IMG_2499.jpeg


IMG_2491.jpeg


There haven’t been anymore window installations for a while. I’m assuming that because the 12th floor seems to have slightly higher ceiling heights, the windows have still not been delivered, as I do not see any windows waiting.

IMG_5517.jpeg


IMG_2511.jpeg


IMG_2511.jpeg



IMG_2511.jpeg


IMG_2511.jpeg


IMG_2511.jpeg

Okay, one last look at eye level.
You can still look down at it for a little bit if you go to the 33rd floor :)
 