Toronto Park Hyatt Renovation | 62.48m | 18s | Oxford Properties | KPMB

To echo earlier comments, I, too, was disheartened to see the evolution of the design on this one, thinking mostly about the differences in the at-grade experience. Obviously, we're very early days here, but looking at those latest renders illustrating a close-up view of the vehicle access area, I'm worried this'll be all too similar to the mess of a podium that we've now got across the street at the old Four Seasons.

The other thing I liked about the earlier iteration from a grade experience standpoint was the apparent opening up of the colonnade stretches at two points along Avenue; right now, it's rather dark and uninviting and people shuffle through quickly (granted, there's little reason to stop). The renderings made it seem as though there was a plan to brighten that all up and raise the height of the overhang, which could've gone a long way to improving the pedestrian experience.
 
Last edited:
I thought this thread is about them turning their hotel into an apartment building

There are currently - and, under these plans, will continue to be - two towers on this site. The southerly tower is planned to be converted into luxury rentals, and the northerly tower and to-be-created podium in between will be Hyatt space.
 
I'm also kind-of hating this latest iteration. While I get they're respecting the original heritage features - I think it's also fair to assess the existing heritage is a bit flawed. It would have been great to have retail extend up Avenue Road instead of the parking turn-around that's illustrated. The language of the new addition also feels really alien to the existing building - it'd be great if they would have at least tried to match the existing stone, instead of the near black stone that's being illustrated. Lastely - this is Yorkville afterall - this is totally one area of the city that deserves a little bling love.
 

Exciting. A few renderings in there I don't think we'd seen before:

upload_2017-4-10_14-5-45.png


upload_2017-4-10_14-6-3.png

upload_2017-4-10_14-9-59.png
 

Attachments

  • upload_2017-4-10_14-5-45.png
    upload_2017-4-10_14-5-45.png
    208.3 KB · Views: 760
  • upload_2017-4-10_14-6-3.png
    upload_2017-4-10_14-6-3.png
    195.3 KB · Views: 773
  • upload_2017-4-10_14-9-59.png
    upload_2017-4-10_14-9-59.png
    204.6 KB · Views: 744
4BE2C2EB-EF7D-4F1B-99C6-299BF5DAE439.jpeg
68EB8CA7-86B4-4BEF-9619-B4B0ACA73F96.jpeg
DDBF22FC-C490-4226-B0ED-D077A36A5C67.jpeg
CB00C6B4-C320-4629-B5A6-192AD912FDAB.jpeg
AF7D3FC1-E4C6-49AD-AB8F-E50BABB9488B.jpeg
3B570498-D94A-4520-99BF-614DFF13511F.jpeg
1415EF06-EF57-43F6-8F93-BE68E07CCA1A.jpeg
Today.
 

Attachments

  • 4BE2C2EB-EF7D-4F1B-99C6-299BF5DAE439.jpeg
    4BE2C2EB-EF7D-4F1B-99C6-299BF5DAE439.jpeg
    272.5 KB · Views: 761
  • 68EB8CA7-86B4-4BEF-9619-B4B0ACA73F96.jpeg
    68EB8CA7-86B4-4BEF-9619-B4B0ACA73F96.jpeg
    209.8 KB · Views: 713
  • DDBF22FC-C490-4226-B0ED-D077A36A5C67.jpeg
    DDBF22FC-C490-4226-B0ED-D077A36A5C67.jpeg
    234.2 KB · Views: 734
  • CB00C6B4-C320-4629-B5A6-192AD912FDAB.jpeg
    CB00C6B4-C320-4629-B5A6-192AD912FDAB.jpeg
    210.7 KB · Views: 729
  • AF7D3FC1-E4C6-49AD-AB8F-E50BABB9488B.jpeg
    AF7D3FC1-E4C6-49AD-AB8F-E50BABB9488B.jpeg
    205.6 KB · Views: 711
  • 3B570498-D94A-4520-99BF-614DFF13511F.jpeg
    3B570498-D94A-4520-99BF-614DFF13511F.jpeg
    253.7 KB · Views: 723
  • 1415EF06-EF57-43F6-8F93-BE68E07CCA1A.jpeg
    1415EF06-EF57-43F6-8F93-BE68E07CCA1A.jpeg
    257.6 KB · Views: 710

Back
Top