Asmegin
Active Member
I'm liking the exterior lights:
I would assume the railings would go up on the south units pretty soon...maybe as soon as the siding is done (just a bit more vinyl to do). I'll keep checking every few days and get pictures as soon as they're up. If anyone sees the railings up when driving across the Dundas bridge, let me know
The top 3 floors in the south section all appear to by drywalled, and are being taped/mudded now. I've seen guys working past 10pm too....so good news for us
Does anyone else think the design is very Alberta? It reminds me of a lot of similar buildings built out west in terms of scale, the use of wood at the corner balconies and the stone detailing. Am I crazy?