gmeo
Active Member
I heard it should be ready for occupancy for next year June.
/\ The building was also raised by 4 stories which may have something to do with it.
And I was at the planning meeting where the initial presentation was made - it started life as a 24s building and was later raised to 28.
And I was at the planning meeting where the initial presentation was made - it started life as a 24s building and was later raised to 28.
Check post #231.
It looks like it might be but wait for parade (because of the bridge connecting them) and signature when it gets builtEither way, there's definitely something different going on partway up, so I'm sure the black glass is still to come. Either way, this seems to be Cityplace's unexpected gem.