For tower 1, according to the pics it looks like it's actually around 14 floors high now? The base is 3, and the top part is at 11 floors.Aug 04
Been a few months since I look at the site and did it on my way home today.
Tower 1 is at the 21th floor with 14 floor to go and the roof. The topping off could come mid to late Nov to early Dec depending on the weather.
Tower 2 was seeing the last of P2 floor pour with a section of P1 frame.
They are making the west wall of tower 2 part of tower 1. Other than that, haven't miss much for July while out of the province.
Photos will surface this month since I have 3 weeks of shooting in front of them at this time.
The elevator shaft numbers are wrong or skip X floor number and was using it to count the floors unnumbed. Just counted it and working the 16 floor. This put the topping off back to Jan 2022. Did noticed some wrong floor number on the elevator and used what I thought was correct for the count I posted.For tower 1, according to the pics it looks like it's actually around 14 floors high now? The base is 3, and the top part is at 11 floors.
A complete guess but it could be part of the cover for the adhesive material placed behind the precast blocks and it would be removed later when they fill the gaps.Anyone know why there are some black strings hanging out from the white cladding?