Toronto Opus and Omega on the Park Condos at Concord Park Place | ?m | 36s | Concord Adex | IBI Group

Nothing I trust, which is why it's not in the thread title. I asked Concord, but their response was to send something saying "we can't build it higher than what's allowed here", as opposed to "here are the docs that show it's going to be X metres high".

42

That's ridiculous. Are there any public venues to get those docs? Building permit?
 
Site plan approval would still have been required, and the city usually posts those docs. They have only been doing that for the last year or two though, and this predates that. All the Development Application Portal has on this one is this:

Site Plan Approval 13 195840 NNY 24 SA Jun 27, 2013 Final Approval Completed Jul 28, 2015

I believe these are considered public documents and would be available through the city clerk's office, but not from anywhere online.
 
They're starting to put windows in!
BF20o7G.jpg

aVBpZWR.jpg

Sjt35Tt.jpg

rQbHW9u.jpg
 
Last edited:
Saturday:

oIMG_3587.JPG
oIMG_3589.JPG
oIMG_3590.JPG
oIMG_3591.JPG
oIMG_3594.JPG
oIMG_3596.JPG
oIMG_3597.JPG
oIMG_3599.JPG
 

Attachments

  • oIMG_3587.JPG
    oIMG_3587.JPG
    889.2 KB · Views: 692
  • oIMG_3589.JPG
    oIMG_3589.JPG
    1 MB · Views: 722
  • oIMG_3590.JPG
    oIMG_3590.JPG
    963.6 KB · Views: 803
  • oIMG_3591.JPG
    oIMG_3591.JPG
    927.4 KB · Views: 777
  • oIMG_3594.JPG
    oIMG_3594.JPG
    1 MB · Views: 733
  • oIMG_3596.JPG
    oIMG_3596.JPG
    1.2 MB · Views: 686
  • oIMG_3597.JPG
    oIMG_3597.JPG
    1.1 MB · Views: 718
  • oIMG_3599.JPG
    oIMG_3599.JPG
    1.1 MB · Views: 699
Not that it's a huge surprise, but it's worth officially noting that the glazing is nothing like what was shown in the renderings. There were no mid-height mullions through the windows, and of course, zero spandrel panels in place of windows. These could have been good-looking buildings, instead there's plenty of godawful sludge-coloured gray.

42
 
Some shots from tonight 07/22/17. (Sorry for the potato cam)

36078383065_13bf3a805f_b.jpg


36078380855_1a47846ffe_b.jpg


36078382045_097c9e6e18_b.jpg


Opus is at floor 9-10, Omega is at floor 11-12. Wonder how long it's going to be before the two towers top out. Maybe they'll finish before winter???
 

Back
Top