Toronto Ontario Line: Riverside-Leslieville Station | 15m | 2s | Metrolinx | HDR

This is very peculiar looking. Any idea what all those “boxes” are for?
it might be mounting points for the facade finishes they want to install. This is what they have on the renders for the LSE joint corridor

1760447644203.png
 
it might be mounting points for the facade finishes they want to install. This is what they have on the renders for the LSE joint corridor

View attachment 688069
No it’s not that - that section is already complete. The photo I commented on is where the station will actually be it just seems to be a really slow and arduous process to create these boxed in mounts. Hopefully constructions accelerates as there is no below ground tunnelling happening here yet these construction practices are taking longer than a dig would have taken in another country. Again hope the elevated stations are built and finished much faster than those that are underground since the complexity for on or above ground stations is far lower when building on or above ground….
 
Excited that the northern sidewalk at Queen/ De Grassi looks like it’ll be reopening soon and revealing the nice wider, brighter and taller realm under the revised bridges in the east end…. Now let’s see how quickly the station can get built behind that new wall / fence! Goodbye to the pedestrian death trap that’s there now!
IMG_0001.jpeg
 