Toronto Ontario Line: Exhibition Station | ?m | ?s | Metrolinx | HDR

The Agenda for next week's Mx Board meeting is now up. The Rapid Transit Capital Projects Update presentation can be found here:


Within said update, we find this:

1676036010787.png
 
the work so far is the "exhibition early works" which involves the construction of some new pedestrian tunnels and a temporary bridge over the tracks to allow the work area to be clear for the subway line.

The image above is the construction of the new north building entrance, building "B" in this image:

ol_-_exhibition_station_ew_graphic_-_dft_v04_aoda_-_2021-04-28.jpg
 
Last edited:
hmm i was under the impression all the tunnels would be closed while the temporary bridge gets built.
maybe they get closed later on? seems kinda weird
 
hmm i was under the impression all the tunnels would be closed while the temporary bridge gets built.
maybe they get closed later on? seems kinda weird
From what I understand the tunnels will remain open for additional capacity.
 
Runnels for bicycles? Runnels for walkers and motorized wheelchairs? Elevators?

This bridge is temporary so there's no chance there would be an elevator, which already exists for the existing pedestrian tunnel that isn't going anywhere.
 
This bridge is temporary so there's no chance there would be an elevator, which already exists for the existing pedestrian tunnel that isn't going anywhere.

The elevators in the tunnel on both the north and south sides have been out of service for quite some time. Hopefully they actually come back in service in the spring as promised.

Elevators remain out of service:

  • The elevators connecting the north and south platforms (Platform 1 and 4) are out of service.
  • If you have accessibility needs, Dignity Transportation shuttle service is available to transport you between the north and south sides of the station.
  • Please follow the signs to access the shuttle service. The shuttle will be located on Atlantic Avenue for access to Platform 1 (the north platform) and Manitoba Drive for access to Platform 4 (the south platform).
  • To request Dignity Transportation shuttle service in advance, call GO Transit at 416-869-3200 or 1-888-438-6646 (toll free). Requests must be made 48 hours in advance of the time of travel.
  • We expect the elevator updates to be complete and back in service later this spring.
 

Back
Top